Skip to main content
Loading…
This section is included in your selections.

All new infrastructure shall be designed and constructed in accordance with CVWD’s Development Design Manual and standard specifications.

A. Design. All plans, designs, and construction drawing(s) must be reviewed and approved by CVWD at the customer’s expense. This includes, but is not limited to, a hydraulic analysis to identify hydraulic impacts associated with the proposed work and available capacity as necessary. Construction inspection will be performed by the district at the customer’s expense.

B. Construction. A construction encroachment permit is required for each entity/contractor installing:

1. Any improvement within United States Bureau of Reclamation fee-owned land or easement; or

2. Any improvement within CVWD fee-owned land or easement; or

3. Improvement involving CVWD facilities within CVWD easement if CVWD facilities are at risk.

All construction shall be performed under direct CVWD inspection. (Ord. 1437.3 § 8-2, 2023; Ord. 1437.2 § 8-2, 2023; Ord. 1437.1 § 8-2, 2022; Ord. 1437 § 2 (Exh. A § 8-2), 2019)