Skip to main content
Loading…
This section is included in your selections.

All irrigation infrastructure was originally constructed by the United States Bureau of Reclamation (USBR) and CVWD operates and maintains the system. The USBR conducts periodic review of the canal and irrigation distribution system. All new pipelines shall be paid for by the customer and turned over to CVWD/USBR once construction is complete and accepted by CVWD. (Ord. 1437.4 § 8-3, 2024; Ord. 1437.3 § 8-3, 2023; Ord. 1437.2 § 8-3, 2023; Ord. 1437.1 § 8-3, 2022; Ord. 1437 § 2 (Exh. A § 8-3), 2019)