Skip to main content
Loading…
This section is included in your selections.

All new drainage infrastructure shall be designed and constructed in accordance with CVWD’s Development Design Manual, standard specifications and construction drawing(s) prepared by the customer. All plans, designs, and drawing(s) must be reviewed and approved by CVWD at the customer’s expense. Construction inspection will be performed by CVWD at the customer’s expense. A construction encroachment permit is required for each entity/contractor installing:

A. Any improvement within CVWD fee-owned land; or

B. Improvement involving CVWD facilities within CVWD easement if CVWD facilities are at risk. (Ord. 1437.3 § 9-2, 2023; Ord. 1437.2 § 9-2, 2023; Ord. 1437.1 § 9-2, 2022; Ord. 1437 § 2 (Exh. A § 9-2), 2019)