4.05.200 Plan checking charge.
This section is included in your selections.
The charge for reviewing and checking the drawings for a sewer extension or interceptor/separator, as provided for in CVWDC 4.05.320 and 4.05.380(A), respectively, is provided in Table A-2, Charge Number A-2.8. (Ord. 1427.5 § 5-7, 2023)