Skip to main content
Loading…
This section is included in your selections.

SCHEDULE OF SPECIAL CHARGES FOR MISCELLANEOUS SERVICES

Charge No.

Description

Charge

Section 1. Development Review Letters (Formerly Flood Hazard Reports)

1.A

Parcel Map

$425

1.B

Tentative Subdivision Map

$530

1.C

Tentative Statutory Condominium Subdivision Map Filing

$380

1.D

Revised Parcel Map or Tentative Subdivision Map

$380

1.E

Conditional Use Permit

$380

1.F

Conditional Use for Recreational Vehicle and Mobile Home Parks

$380

1.G

Change of Zone

$380

1.H

Specific Plan

$530

1.I

Plot Plans

$380

1.J

Public Use Permits

$380

1.K

Detached Second Unit Permits

$380

1.L

Lot Line Adjustment

$380

1.M

Large Family Day Care Home

$380

1.N

Surface Mining Permit

$425

1.O

Hazardous Waste Sighting Permit

$380

1.P

Certificate of Compliance

$380

Section 2. Inspection Charge

2.A

Inspection Charge

Minimum deposit of $1,000 or more. Inspection based on actual costs. Job cost estimate provided prior to project commencing.

2.B

Regular

$95/hour

2.C

Overtime

$115/hour

Section 3. Laboratory Test Fees

3.A

Membrane Filter Standard Coliform Bacteria

$40

3.B

3 Dilution MTF Coliform Test

$40

3.C

3 Dilution MTF Fecal Test (Must Have Coliform Test)

$25

3.D

3 Dilution MTF E. Coli Test (Must Have Fecal Test)

$25

3.E

Enzyme Substrate (Colilert, Colisure) Presence/Absence

$40

3.F

Enzyme Substrate Enumeration (Quanti-Tray)

$60

3.G

Heterotrophic (Standard) Plate Count

$20

3.H

Microscopic Exam

$50

3.I

Alkalinity

$15

3.J

Aluminum

$35

3.K

Antimony

$35

3.L

Arsenic

$35

3.M

Asbestos

$200

3.N

Barium

$35

3.O

Beryllium

$35

3.P

Boron

$20

3.Q

Bromide

$20

3.R

Cadmium

$35

3.S

Calcium

$15

3.T

Chloride

$20

3.U

Chlorine (Free)

$15

3.V

Chlorine (Total)

$15

3.W

Chromium (Total)

$35

3.X

Chromium +6 (Hexavalent)

$90

3.Y

Color

$15

3.Z

Copper

$35

3.AA

Cyanide (Total)

$45

3.AB

Cyanide (Total/Amenable)

$100

3.AC

Fluoride

$20

3.AD

Hardness

$32

3.AE

Iron

$15

3.AF

Lead

$35

3.AG

Magnesium

$15

3.AH

Manganese

$15

3.AI

Mercury

$30

3.AJ

Nickel

$35

3.AK

Nitrate

$20

3.AL

Nitrite

$20

3.AM

Odor

$17

3.AN

Oxygen Demand, Carbonaceous Biochemical (cBOD5)

$65

3.AO

Oxygen, Dissolved (DO)

$15

3.AP

Perchlorate

$55

3.AQ

pH

$15

3.AR

Phosphate

$20

3.AS

Potassium

$15

3.AT

Selenium

$35

3.AU

Sodium

$15

3.AV

Specific Conductance

$15

3.AW

Sulfate

$15

3.AX

Suspended Solids (Total and Volatile)

$35

3.AY

Thallium

$35

3.AZ

Total Dissolved Solids

$18

3.BA

Turbidity

$15

3.BB

General Mineral

$320

3.BC

Soil Extraction – Saturation Paste Extract (without Saturation Percentage)

$20

3.BD

Sieve Analyses

$45

3.BE

Hexane Extractable Materials (HEM)

$50

3.BF

Hexane Extractable Materials – Silica Gel Treatment (HEM-SGT)

$100

Section 4. Miscellaneous Fees and Charges

4.A

Photography – Aerial Color

$2.50 per printed square foot

4.B

Maps and Drawings, per Square Foot

$1.50 Minimum Charge

$0.25/square foot, $1.50 minimum

4.C

Domestic Water, Sanitation and Irrigation Plat Sheets, per Sheet

$1.00/sheet

4.D

Mylar, per Square Foot

$2.50/square foot

4.E

Shipping and Handling Fee for Reproductions

$22.50

4.F

Returned Payment Charge

$25.00 first offense, or such higher amount as is authorized by law

4.G

Photocopying Cost per Page up to 11 x 17 Size Black and White

$0.25/page

Section 5. Plan Check Fees

5.A

Plan Check Charge

$450 per plan submittal fee, plus $65 per hour

5.B

Landscape Plan Check Fee

$300 submittal fee, plus $65 per hour actual costs

Section 6. Right-of-Way/Survey and Encroachment Fees

6.A

Developer/Landowner/Engineer Initiated ROW Transaction Document Review

$2,000 deposit, charges at actual cost

6.B

Noninterference Map Review

$260

6.C

Encroachment Permit Fees:

Encroachment Permit Processing Fee

$100

Noninterference Review Letter (NIRL)

$100

Encroachment Permit Inspection Deposit

$0

Temporary Encroachment Permit – Construction Water Deposit

$1,000

6.D

Permit Fee for Storm Water Outlet into Storm Water Channel

$100 per inch diameter or equivalent

6.E

Legal Document Review and Deposit Preparation

$5,000 up to $25,000 deposit, charge at actual costs

6.F

Plat/Legal Review Fee

Minimum deposit of $1,000 or more. Fee for review based on actual costs. Job cost estimate provided prior to project commencing.

Section 7. Water Quality Monitoring and Reporting Fees

7.A

Developer/Landowner/Engineer Initiated Request for Well/Water Quality Data

$1,000 deposit, charge actual fees

7.B

Water Quality Sampling Fee

$75 per hour

(Ord. 1403.2, 2018; Ord. 1358, 2007; Ord. 1335, 2005; Ord. 1314, 2004; Ord. 1299, 2002; Ord. 1257, 1996; Ord. 1254, 1995; Ord. 1247, 1994; Ord. 1237, 1993; Ord. 1225, 1991; Ord. 1217, 1990; Ord. 1209, 1989; Ord. 1200, 1988; Ord. 1192, 1987; Ord. 1180, 1986; Ord. 1172, 1985; Ord. 1164, 1984)