Skip to main content
Loading…
This section is included in your selections.

SCHEDULE OF SPECIAL CHARGES FOR MISCELLANEOUS SERVICES
Effective September 1, 2021

Charge No.

Description

Charge

Public Outreach

Section 1. Tours

1.A

Imperial Dam Tour – Per Person

$0

1.B

Half-Day Public Tour – Per Person

$0

1.C

Half-Day Private Tour – Per Person

$0

Section 2. Landscape Plan Check Fees

2.A

Landscape Plan Check Fee – Base

$218

2.B

Landscape Plan Check Fee – Hourly

$161

Section 3. Other Fees

3.A

Landscape Recheck Fee – Per Recheck

$291

3.B

Landscape Workshop

$0

3.C

Outdoor Budget Review (residential)
Customers who request repeated reviews may be subject to the fees if the cost incurred is due to changes the customer initiates at the property.

$0
*may be subject to fees*

3.D

Outdoor Budget Review (nonresidential)
Customers who request repeated reviews may be subject to the fees if the cost incurred is due to changes the customer initiates at the property.

$0
*may be subject to fees*

Engineering Services

Section 4. Development Review Letters

4.A

Parcel Map

$706

4.B

Tentative Subdivision Map

$706

4.C

Tentative Statutory Condominium Subdivision Map Filing

$505

4.D

Revised Parcel Map or Tentative Subdivision Map

$505

4.E

Conditional Use Permit

$435

4.F

Conditional Use for Recreational Vehicle and Mobile Home Parks

$435

4.G

Change of Zone

$435

4.H

Specific Plan

$706

4.I

Plot Plans

$591

4.J

Public Use Permits

$435

4.K

Detached Second Unit Permits

$435

4.L

Lot Line Adjustment

$435

4.M

Large Family Day Care Home

$435

4.N

Surface Mining Permit

$505

4.O

Hazardous Waste Sighting Permit

$505

4.P

Certificate of Compliance

$435

Section 5. Inspection Charge

CVWD charges developers for inspection services on all projects. At the beginning of the project, the developer is provided an estimated inspection charge and required to provide a deposit. The developer pays for the actual costs to complete the inspection of the project.

Inspection charges – Minimum deposit of $1,000 or more. Inspection based on actual costs. Job cost estimate provided prior to project commencing.

5.A

Minimum Deposit

$1,000

Section 6. Plan Check Fees

CVWD charges developers for plan check services on all projects. At the beginning of the project, the developer is required to provide a base processing fee. This fee covers the time it takes for development services to set up the initial project account and documentation required to process the project. The developer pays for the actual costs to complete the plan checks for the project based on the current rates for CVWD plan checkers.

6.A

Plan Check Fee – Base
Minimum fee required to begin work

$806

6.B

Plan Check Fee – Each Additional Hour

$172

Section 7. Right-of-Way Survey/Encroachment Fees

7.A

Noninterference Map Review

$366

7.B

Encroachment Permit Fee Processing

$346

7.C

Developer/Landowner/Engineer Initiated ROW Transaction Document Review

$2,000 deposit, charges at actual cost

7.D

Legal Document Review and Deposit Preparation

$5,000 up to $25,000 deposit, charge at actual costs

7.E

Plat/Legal Review Fee
Fee for review based on actual costs. Job cost estimate provided prior to project commencing.

Minimum deposit of $1,000 or more

Environmental Services

Section 8. Other Fees

8.A

Information/Research Requests (per hour)

$150

8.B

Water Supply Assessments Review

$812

Section 9. Cooling Tower Compliance Program

9.A

Application Fee

$252

9.B

Annual Permit Fee

$126

Section 10. Laboratory Fees

10.A

Membrane Filter Standard Coliform Bacteria

$44

10.B

3 Dilution MTF Coliform Test

$88

10.C

3 Dilution MTF Fecal Test (must have coliform test)

$0

10.D

3 Dilution MTF E. coli Test (must have MTF coliform test)

$60

10.E

Enzyme Substrate (Colilert, Colisure) Presence/Absence

$25

10.F

Enzyme Substrate Enumeration (QuantiTray)

$29

10.G

Heterotrophic (standard) Plate Count

$47

10.H

Microscopic Exam

$83

10.I

Alkalinity

$41

10.J

Aluminum

Actual Cost + Processing Fee

10.K

Antimony

Actual Cost + Processing Fee

10.L

Arsenic

$40

10.M

Asbestos

Actual Cost + Processing Fee

10.N

Barium

Actual Cost + Processing Fee

10.O

Beryllium

Actual Cost + Processing Fee

10.P

Boron

Actual Cost + Processing Fee

10.Q

Bromide

$35

10.R

Cadmium

Actual Cost + Processing Fee

10.S

Calcium

$40

10.T

Chloride

$35

10.U

Chlorine (free)

$18

10.V

Chlorine (total)

$18

10.W

Chromium (total)

$40

10.X

Chromium +6 (hexavalent)

$30

10.Y

Color

$13

10.Z

Copper

$40

10.AA

Cyanide (total)

$135

10.AB

Cyanide (total/amenable)

$131

10.AC

Fluoride

$35

10.AD

Hardness

$51

10.AE

Iron

Actual Cost + $59 Processing Fee

10.AF

Lead

$40

10.AG

Magnesium

$40

10.AH

Manganese

Actual Cost + $59 Processing Fee

10.AI

Mercury

Actual Cost + $59 Processing Fee

10.AJ

Nickel

Actual Cost + $59 Processing Fee

10.AK

Nitrate

$35

10.AL

Nitrite

$35

10.AM

Odor

$16

10.AN

Oxygen Demand, Carbonaceous Biochemical (cBOD5)

$66

10.AO

Oxygen, Dissolved (DO)

$40

10.AP

Perchlorate

Actual Cost + $59 Processing Fee

10.AQ

pH

$18

10.AR

Phosphate

$35

10.AS

Potassium

$40

10.AT

Selenium

$40

10.AU

Settleable Solids

$22

10.AV

Sodium

$40

10.AW

Specific Conductance

$22

10.AX

Sulfate

$35

10.AY

Suspended Solids (total)

$29

10.AZ

Thallium

Actual Cost + $59 Processing Fee

10.BA

Tin

$49

10.BB

Total Dissolved Solids

$36

10.BC

Turbidity

$13

10.BD

General Mineral

$389

10.BE

General Mineral Anions

$50

10.BF

Soil Extraction – Saturation Paste Extract (without saturation percentage)

$0

10.BG

Sieve Analyses

$239

10.BH

Hexane Extractable Materials (HEM)

$0

10.BI

Hexane Extractable Materials – Silica Gel Treatment (HEM-SGT)

$0

10.BJ

Water Quality Sampling Fee

$137

10.BK

Lab Processing Fee

$59

10.BL

Lake Cahuilla Event/Quagga Control

$1,608

Section 11. Corrosivity Indices

11.A

Aggressive

$40

11.B

Langlier

$40

11.C

Larson Skold

$40

Meter Services

Section 12. New Service

12.A

Account Establishment Fee

$46

12.B

Deposit to Establish New Commercial Account

$250

12.C

Same Day Turn-On Between 8:00 a.m. and 5:00 p.m. Weekdays (excl. holidays)

$52

12.D

Next Day Turn-On Between 8:00 a.m. and 5:00 p.m. Weekdays (excl. holidays)

$0

12.E

Turn-On Between 3:00 p.m. and 10:00 p.m. Weekdays (excl. holidays)

$126

12.F

Turn-On Between 5:00 p.m. and 8:00 a.m.; All Day Weekends and Holidays

$252

Section 13. Restoration of Services

13.A

Same Day Restoration Between 8:00 a.m. and 5:00 p.m. Weekdays (excl. holidays)

$116

13.B

Next Day Restoration Between 8:00 a.m. and 5:00 p.m. Weekdays (excl. holidays)

$86

13.C

Evening Restoration Between 3:00 p.m. and 10:00 p.m. Weekdays; All Day Weekends and Holidays

$0

13.D

Night Restoration Between 5:00 p.m. and 8:00 a.m.; All Day Weekends and Holidays

$252

13.E

Restoration of Service after Unauthorized Restoration by Others Within One Year (per occurrence)

First $75
Second $150
Third $500
Fourth $1,000

Section 14. Enrolled Help2Others Customers

14.A

Same Day Restoration Between 8:00 a.m. and 5:00 p.m. Weekdays (excl. holidays)

$50

14.B

Next Day Restoration Between 8:00 a.m. and 3:00 p.m. Weekdays (excl. holidays)

$50

14.C

Evening Restoration Between 3:00 p.m. and 10:00 p.m. Weekdays; All Day Weekends and Holidays

$0

14.D

Night Restoration Between 5:00 p.m. and 8:00 a.m. Weekdays; All Day Weekends and Holidays

$150

Section 15. Unauthorized Use Penalties

15.A

Unauthorized Installation/Connection/Use (each offense)

$1,000

15.B

Unauthorized Use of a Private Fire Protection Service Connection (each offense)

$1,000

15.C

Restoration of Service after Unauthorized Installations/Connection/Use (3/4" meter size)

$390

15.D

Restoration of Service after Unauthorized Installations/Connection/Use (1" meter size)

$400

15.E

Restoration of Service after Unauthorized Installations/Connection/Use (1-1/2" meter size)

$500

15.F

Restoration of Service after Unauthorized Installations/Connection/Use (2" meter size)

$650

15.G

Cutting District Lock or Bypassing Meter

$200

15.H

Damage to Meter, Pipeline, Reservoir, Well Site or Other Component of the Domestic Water Service Infrastructure

$300

15.I

Broken Meter Stop/Shut-Off Valve

$525

Section 16. Miscellaneous Fees

16.A

Return Payment Charge

$25

16.B

Delinquency Charge

$25

16.C

Meter Testing – 2" or Less

$124

16.D

Meter Testing – Greater Than 2"

$484

16.E

High Consumption Investigation Fee

$151

Meter Installation

Section 17. Direct Read Meter

17.A

Direct Read Meter and Service – 3/4" and 1"

$4,538

17.B

Direct Read Meter and Service – 1" and 1-1/2"

$5,478

17.C

Direct Read Meter and Service – 1-1/2" and 2"

$6,391

17.D

Direct Read Meter and Service – 2' and 2"

$6,685

17.E

Direct Read (meter only) – 3/4"

$421

17.F

Direct Read (meter only) – 1"

$458

17.G

Direct Read (meter only) – 1-1/2"

$937

17.H

Direct Read (meter only) – 2"

$1,229

Section 18. AMR Meter

18.A

AMR Meter and Service – 3/4" and 1"

$4,721

18.B

AMR Meter and Service – 1" and 1-1/2"

$5,664

18.C

AMR Meter and Service – 1-1/2" and 2"

$6,550

18.D

AMR Meter and Service – 2' and 2"

$6,864

18.E

AMR (meter only) – 3/4"

$605

18.F

AMR (meter only) – 1"

$644

18.G

AMR (meter only) – 1-1/2"

$1,096

18.H

AMR (meter only) – 2"

$1,408

Section 19. Other Meter and Service Fees

19.A

Service Only – 1"

$4,171

19.B

Service Only – 1-1/2"

$5,075

19.C

Service Only – 2"

$5,509

19.D

Backflow Prevention Device – Double Check Device – 1"

$649

19.E

Backflow Prevention Device – Double Check Device – 2"

$1,478

19.F

Backflow Prevention Device – Reduced Pressure Device – 1"

$792

19.G

Backflow Prevention Device – Reduced Pressure Device – 2"

$1,592

19.H

Special Box and Traffic Cover

$493

19.I

Extend Existing Service Connection <15' – 1"

$1,564

19.J

Extend Existing Service Connection <15' – 1-1/2"

$2,229

19.K

Extend Existing Service Connection <15' – 2"

$2,739

19.L

Fire Sprinkler Retrofit – 1"

$287

19.M

Fire Sprinkler Retrofit – 1-1/2"

$394

19.N

Fire Sprinkler Retrofit – 2"

$500

19.O

Temporary Construction Meter – Relocation Charge

$202

19.P

Temporary Construction Meter – Change Meter Size

$434

19.Q

Temporary Construction Meter – Installation and Removal (3" or smaller)

$304

19.R

Temporary Construction Meter – Installation and Removal (4" or larger)

$549

19.S

Meter Pull

$165

Septage Fees

Section 20. Septage

20.A

Application Fee – Includes Up to 3 Trucks

$1,095

20.B

Card Reactivation Fee – Per Card

$55

20.C

Lost Card Fee – Per Card

$41

20.D

Renewal Fee

$327

20.E

Additional Truck – During Initial Application

$55

20.F

Additional Truck – Outside During the Initial Application

$82

Clerk Fees

Section 21. Clerk Fees

21.A

Digital Records Request – Per USB, CD, or DVD

$3

(Ord. 1403.3, 2021; Ord. 1358, 2007; Ord. 1335, 2005; Ord. 1314, 2004; Ord. 1299, 2002; Ord. 1257, 1996; Ord. 1254, 1995; Ord. 1247, 1994; Ord. 1237, 1993; Ord. 1225, 1991; Ord. 1217, 1990; Ord. 1209, 1989; Ord. 1200, 1988; Ord. 1192, 1987; Ord. 1180, 1986; Ord. 1172, 1985; Ord. 1164, 1984)